Recent Projects

 

NIWA High Performance Computing Facility, Wellington

This large scale project involved the design and manufacture of four type tested Prisma P System main boards, a smaller Prisma G switchboard, as well as a standalone Mechanical Services Switchboard. The project specified IP 55 enclosures and Form3b segregation which allow easier segregation of live components, meaning the boards can be worked on in a live state.

NIWA Computing Facility Wellington NIWA Computing Facility Wellington


Waimate West Water Treatment Plant

In 2013 we were commissioned to manufacture the boards required to upgrade the Waimate West Water Treatment Plant. This involved the design and manufacture of a total of 25 boards including the main Motor Control Centre, Distribution Boards, Junction Boxes and Local Control Station Panels. This followed the successful provision of multiple boards for the Masterton, Shannon and Stratford WaterTreatment Plants over recent years.

Waimate West WTP Motor Control Centre: NHP Modular Metalwork Waimate West WTP Motor Control Centre: NHP Modular Metalwork
Waimate West WTP Motor Control Centre: NHP Modular Metalwork


IRD Office Refurbishment, Jepsen Grove

This project included the design and manufacture of a Schneider Type Tested Prisma Plus P System Main Switchboard, which included a 1600A Main and Generator Motorised ACB, Quasar Power Monitor and third party Auto Transfer System, plus various submains, UPS and Distribution Boards.

IRD Office Refurbishment IRD Office Refurbishment IRD Office Refurbishment

IRD UPS Distribution Board: Excel Modular Metalwork IRD UPS Distribution Board: Excel Modular Metalwork
IRD UPS Distribution Board: Excel Modular Metalwork


Countdown Supermarket, Churchill Drive

The construction of this new supermarket in 2013 required the design and manufacture of a Type Tested Prisma P Plus Main Switchboard, a Power Factor Correction Unit and 10 distribution Boards.

Countdown Supermarket, Churchill Drive Countdown Supermarket, Churchill Drive


Elevate Apartments

This project included a type tested Prisma P Main Switchboard and a series of DB's constructed from Excel Modular metalwork.

Elevate Apartments Elevate Apartments


Hope Gibbons

The seismic strengthening of this Wellington Building included the replacement of the Main Switchboard and Distributions boards for each level.

Hope Gibbons Hope Gibbons


Wellington City Council Pump Stations

Two of 5 replacement Main Switchboards and Motor Control Centres built for Wellington Water Ltd. These boards were constructed using Hensel Fibox (IP65) modular cabinets with transparent doors and covers.

Wellington City Council Pump Stations Wellington City Council Pump Stations


Villa Maria Marlborough Winery Extension

Excel designed and manufactured a new Type Tested Prisma Plus P 1600A mains and generator supplied Main Switchboard; Automatic Power Factor Correction Unit (300kVAr) with harmonic blocking chokes, plus a number of distribution boards including a number to be sited outdoors. In these cases we supplied Prisma G cabinets housed in powder coated aluminium pillar boxes.

Villa Maria Marlborough Winery Extension Villa Maria Marlborough Winery Extension
Main Switchboard (left) and Power Factor Correction Unit